Precursors
A good listed in Annex I is a precursor when used in production. For a purchased precursor, actual values need the supplier's installation details, specific emissions and verification report. Otherwise a default value is used for the precursor. The process can be actual while a precursor is default.
Legal basis: 2025/2547 Art. 1(7), Art. 15
Indirect emissions
For iron, steel and aluminium only direct emissions count. For cement and fertilisers indirect emissions are added.
Legal basis: 2023/956 Art. 7(1), Annex II
System boundary
For iron or steel products, rolling, wire drawing and galvanising are included. Cutting, welding and finishing are excluded.
Legal basis: 2025/2547 Annex I 3.16.2
Reporting period
The calendar year. For goods imported in 2026 the period is 2026.
Legal basis: 2025/2547 Art. 7(1)